<tr id="kyiui"><td id="kyiui"></td></tr><ul id="kyiui"><pre id="kyiui"></pre></ul>
<samp id="kyiui"></samp>
  • <samp id="kyiui"></samp>
    <th id="kyiui"><menu id="kyiui"></menu></th>
    <samp id="kyiui"></samp>
  • <th id="kyiui"><menu id="kyiui"></menu></th>
    <ul id="kyiui"><center id="kyiui"></center></ul>
  • <ul id="kyiui"><tbody id="kyiui"></tbody></ul>
    一本色道久久综合亚洲精品小说,日韩亚洲国产一区情侣,亚洲成人电影在线观看精品国产,亚洲乱码AV一区二区,国产精品公开免费视频,精品手机在线视频,精品人无码一区二区三区,一区二区二区三区av

    Jiangmen hardware accessories factory analyzes its mold processing process arrangement

    2019-12-29 1652

      Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

      Process flow arrangement

      1. Bottom surface processing, processing quantity guarantee;

      2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

      3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

      4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

      5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

      6. Check and recheck the machining accuracy;

      7. Fitter setting process;

      8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

      9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

      10. Check and recheck the machining accuracy.

      Jiangmen hardware accessories factory http://m.yijudc.com//


    主站蜘蛛池模板: 春色成人在线一区av| 中国国内新视频在线不卡免费看| 啪啪视频免费看一区二区| 福建省| 亚洲一区二区高清精品| 日本免费一区二区三区在线观看| 中文字幕亚洲国产精品| 常宁市| 久久久婷婷综合五月天 | 中文成人无字幕乱码精品 | 蜜桃av性感妹子在线播放| 国产国拍亚洲精品福利| 亚洲区一区二区中文字幕| 收藏| 新乐市| 东宁县| 蓬安县| 花莲县| 玛曲县| 邓州市| 上高县| 滦南县| 亚洲成AV人国产毛片| 亚洲一区二区三区品视频| 精品国产午夜久久久久九九| 弥渡县| 广元市| 祁东县| 人妖熟女少妇人妖少妇| av天堂线上| 国产精品福利久久香蕉中文| 亚洲无码中文字幕日韩无码| 额尔古纳市| 午夜日韩成年人视频在线观看| 精品理论一区二区三区| 扎兰屯市| 538亚洲欧美国产日韩在线精品| 亚洲AV无码一区二区三区精神| av狼人婷婷久久亚洲综合| 无码a级毛片免费视频内谢 | 91精品日本久久久久久牛牛 |