<tr id="kyiui"><td id="kyiui"></td></tr><ul id="kyiui"><pre id="kyiui"></pre></ul>
<samp id="kyiui"></samp>
  • <samp id="kyiui"></samp>
    <th id="kyiui"><menu id="kyiui"></menu></th>
    <samp id="kyiui"></samp>
  • <th id="kyiui"><menu id="kyiui"></menu></th>
    <ul id="kyiui"><center id="kyiui"></center></ul>
  • <ul id="kyiui"><tbody id="kyiui"></tbody></ul>
    一本色道久久综合亚洲精品小说,日韩亚洲国产一区情侣,亚洲成人电影在线观看精品国产,亚洲乱码AV一区二区,国产精品公开免费视频,精品手机在线视频,精品人无码一区二区三区,一区二区二区三区av

    Jiangmen hardware accessories factory analyzes its mold processing process arrangement

    2019-12-29 1765

      Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

      Process flow arrangement

      1. Bottom surface processing, processing quantity guarantee;

      2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

      3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

      4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

      5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

      6. Check and recheck the machining accuracy;

      7. Fitter setting process;

      8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

      9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

      10. Check and recheck the machining accuracy.

      Jiangmen hardware accessories factory http://m.yijudc.com//


    主站蜘蛛池模板: 国产精品视频一区二区三区观看| 国产成人综合久久精品推荐免费 | 亚洲精品国产视频一区二区| 中文字幕亚洲第一页在线| 97人妻精品一区二区三区免 | 精品女同免费在线观看| 日韩av在线一二三四区| 女同久久一区二区三区| 蛟河市| 日本一区二区三区东京热| 亚洲妇女av一区二区| 国产三级国产精品三级在专区| 突泉县| 亚洲成av人无码免费观看| 亚洲国产高清在线视频| 华阴市| 亚洲中字幕永久在线观看| 务川| 亚洲熟妇夜夜一区二区三区| 另类人妖在线观看一区二区| 国产成人一区二区三区视频免费蜜| 久久综合给合久久97色| 精品樱空桃一区二区三区| 久久露脸国产精品WWW| 国产亚洲三级在线视频| 亚洲日本VA午夜在线电影| 亚洲午夜久久久久中文字幕久 | 色偷偷亚洲av男人的天堂| 平山县| 精品国免费一区二区三区| 国产在线一区二区视频免费观看| 日本一极品久久99精品| 欧美亚洲日韩国产人成在线播放| 亚洲综合久久久中文字幕| 日本熟妇hd8ex视频| 久久精品国产88久久综合| 亚洲伊人免费综合网站| 久天啪天天久久99久孕妇| 久久精品成人免费观看97| 亚洲国产精品综合久久20| 国产精品视频一区二区三区,|